Design Actions
Phase 1
Phase 2
Phase 3
Phase 4
-
Refurbishment of Millennium Mills into a mixed use building
-
Begin to landscape design the waterfront to activate it
-
Restoration of Silo D
-
Develop residential units on the east side of the site
-
Develop mixed use, relatively high density buildings with shops or restaurants on the bottom and residential on top to activate the waterfront of the eastern side of the site
-
Construct a bridge over the opening into Pontoon Dock to connect the west and east side of the site and continue the waterfront
-
Promote on land meanwhile enterprises, such as paintballing, markets, and events, which will in turn, declutter the site land ready for development
-
Promote meanwhile water uses, such as boat hires on Pontoon Dock, to kickstart attracting people to the site
-
Construct another, more easily accessible (from ground level) bridge across from the site to the Excel centre
-
Construction of pedestrian and cycle pathway leading from the newly constructed bridge to the Thames Barrier park; which will be a strategic connection
-
Begin improvement of the green spaces and parks
-
Expansion and development of the amphitheatre
-
Develop the old dock cranes into an exhibition